Arjan · 2 BR · Ref. PSQ-OP-1840
Completion is registered for 1 December 2026, yet DLD records it 22.25% built — 309 homes; 2 beds from AED 1,994,375. Platinum Square Real Estate sells 2 bedroom apartments in Trinity, Arjan.
Developer: Karma Developers — registered with the Dubai Land Department as Karma Realty Developers L.L.C, under the project name “Trinity By Karma”
DLD project number: 2933 — status Active
Location: Arjan, Al Barsha South Third, Dubai
Total units (DLD): 309, all residential — 236 one-bedroom, 66 two-bedroom, 7 three-bedroom. No commercial units.
Plot area (DLD): 29,243.99 sq m
Construction progress (DLD): 22.25% complete
Registered with DLD: 8 March 2024; construction started 1 July 2024
Completion registered with DLD: 1 December 2026
Listed with us: 2 bedrooms, about 1,712 sq ft, from AED 1,994,375 (roughly AED 1,165 per sq ft)
Payment plan: our feed carries only a placeholder; Tanami Properties publishes 10% booking, 42% during construction, 1% on handover, 47% post-handover over 47 months — see below
Status: Off-plan, under construction
DLD figures were read from the Project Status Enquiry service on 25 September 2026; price and size are from the current feed and change. Platinum Square confirms both in writing before you reserve. The rate per sq ft is our own arithmetic.
The Dubai Land Department registers completion for 1 December 2026 — roughly two months from now. The same register records the project at 22.25% complete, with construction having started on 1 July 2024.
A building that is 22% built does not complete in two months. That does not make the project unsound: 22.25% is real progress, the project is Active rather than cancelled, and registered dates are revised all the time. But it does mean the registered date on the file is out of step with the site, and any date quoted to you verbally should be treated as a forecast, not a commitment.
What to do about it: ask for the developer’s current written handover date, ask what the sale and purchase agreement says about delay and compensation, and re-check the completion percentage on the DLD Project Status Enquiry before every instalment. All three are free.
The payment plan field in our feed contains the words “Payment Plan” and no terms — a placeholder, not a plan. The fullest published version we have found is Tanami Properties’, read on 25 September 2026:
10% down payment on booking
42% during construction, across 33 instalments
1% on handover
47% post-handover, spread over 47 months
If that holds, it is the most important fact on this page. Paying 1% at handover and 47% over the following four years means you can take the keys, let the apartment, and let the rent carry a large part of the remaining balance. It also explains the pricing: about AED 1,165 per sq ft on a 1,712 sq ft two-bedroom is low for Arjan, and long post-handover plans are usually priced in.
Two cautions. A 47-month tail is a 47-month liability, and it is unsecured against a building that is 22.25% complete with a registered completion date two months away. And this is one portal’s published version, not a term sheet. Ask Karma Developers for the dated schedule on the reservation form, and ask specifically what falls due before completion.
Registered with the DLD for 1 December 2026; our feed shows Q4 2026. A registered completion date is a date on the developer’s file, never proof that keys have been handed over. See the section above.
The feed lists a swimming pool, gym, sauna, jacuzzi, clubhouse, tennis court, landscaped gardens, kids’ play area, 24-hour security and concierge service.
Arjan, in Al Barsha South Third — the Dubailand-side apartment district next to Dubai Miracle Garden and Dubai Butterfly Garden, with Sheikh Mohammed Bin Zayed Road on its edge. It is one of the more affordable freehold apartment areas inside the city rather than on its outskirts. We do not publish drive times we have not measured; ask and we will send current routing.
The unit on our list is unusual and worth understanding. At about 1,712 sq ft for a two-bedroom it is very large — most Arjan two-beds are 1,000–1,200 sq ft — and at roughly AED 1,165 per sq ft it is priced well below the district’s typical new-build rate per foot. You are buying space cheaply.
The trade-off is the one described above: the registered completion date and the construction percentage do not agree, so this suits a buyer who can absorb a delay and who values floor area over a fixed move-in date. An owner-occupier working to a deadline should look at the paperwork very carefully first. With only 66 two-bedroom and 7 three-bedroom homes against 236 one-bedroom, the larger units are also the scarce end of a building that is otherwise built for letting.
Ask for the developer’s current written handover date, and what the previous one was.
Ask what the sale and purchase agreement says about delay and compensation.
Get the payment plan with dates, and confirm in writing that the 47-month post-handover tail Tanami publishes applies to your unit.
Ask for the escrow account for project 2933 and pay only into it.
Re-check the DLD completion percentage before every instalment.
Ask for a dated site photograph rather than a render.
Confirm the 1,712 sq ft is the sellable area and what it includes.
A 309-home residential building by Karma Developers in Arjan, Dubai, registered with the Dubai Land Department as project 2933 under the name Trinity By Karma.
Arjan, in the Al Barsha South Third district, near Dubai Miracle Garden.
Karma Developers. The Dubai Land Department registers the project as “Trinity By Karma”, developer Karma Realty Developers L.L.C, which is the authoritative record. Note that at least one portal (Tanami Properties) lists the developer as Deca Properties for the same building and the same starting price — if a seller names Deca, ask them to reconcile it with the DLD record before you sign.
Completion is registered with the DLD for 1 December 2026. The same register showed the project 22.25% complete in September 2026, so ask the developer for the current written date before relying on it.
Our feed carries only a placeholder. Tanami Properties publishes 10% on booking, 42% during construction over 33 instalments, 1% on handover and 47% post-handover across 47 months (read 25 September 2026). Confirm it on the developer’s reservation form.
22.25% complete on the DLD Project Status Enquiry, read on 25 September 2026. Construction started on 1 July 2024.
From AED 1,994,375 for about 1,712 sq ft in the current feed — roughly AED 1,165 per sq ft.
309 homes: 236 one-bedroom, 66 two-bedroom and 7 three-bedroom, per the DLD registry.
It is a single residential building on a 29,244 sq m plot rather than a masterplanned community. Ask us for the floor plates and podium layout and we will send what the developer has published.
The registry records 236 one-bedroom and just 7 three-bedroom homes. What is on our list changes — ask for today’s availability.